Metalinvest Remko has completed and commissioned a new painting tunnel of 400 m² — 80 metres long, 5 metres wide and 3.5 metres high — designed to increase capacity, optimise coating processes and raise quality and consistency.
Highlights
- Complete line: primer booth, air preparation, Flash-Off zones, curing ovens at 150 °C, cooling zones and top-coat booth.
- High-pressure two-component airless spray system for uniform coverage and minimal material loss.
- High-efficiency aspiration and a centralised control panel for continuous process monitoring.
The new tunnel ensures uniform film thickness, stronger adhesion and greater durability — with shorter lead times across larger production volumes.